send mail to support@abhimanu.com mentioning your email id and mobileno registered with us! if details not recieved
Resend Opt after 60 Sec.
By Loging in you agree to Terms of Services and Privacy Policy
Claim your free MCQ
Please specify
Please verify your mobile number
Login not allowed, Please logout from existing browser
Please update your name
Subscribe to Notifications
Stay updated with the latest Current affairs and other important updates regarding video Lectures, Test Schedules, live sessions etc..
Your Free user account at abhipedia has been created.
Remember, success is a journey, not a destination. Stay motivated and keep moving forward!
Refer & Earn
Enquire Now
My Abhipedia Earning
Kindly Login to view your earning
Support
Context:
Tamil Nadu has rejected the idea for an exclusive discussion by the Cauvery Water Management Authority (CWMA) on the Mekedatu Balancing Reservoir-cum-Drinking Water Project proposed by Karnataka.
What’s the issue? Why is the project delayed?
Tamil Nadu has protested against Karnataka’s move to build a reservoir on river Cauvery at Mekedatu. It is “not acceptable” to the state that Karnataka wants to utilise 4.75 tmc as drinking water from a reservoir with a storage capacity of 67tmc ft.
=> However, the Karnataka Government has asserted that there is no “compromise” on the Mekedatu project and the state wants to undertake the project.
Water sharing between Karnataka and Tamil Nadu:
Karnataka is supposed to release Cauvery water from three sources:
=> One being the water flowing in the areas downstream River Kabini, catchment areas of Krishnarajasagar reservoir, the sub-basins of Shimsha, Arkavathi, and Suvarnavathi rivers, and the water from minor rivers.
=> Secondly, water is released from Kabini dam.
=> The third source is water that is released from Krishnarajasagar dam.
In the case of the second and third sources, which are under the control of Karnataka, water is released to TN only after storing sufficient water for their use.
About the Project:
Why is Tamil Nadu against this project?
=> It says, the CWDT and the SC have found that the existing storage facilities available in the Cauvery basin were adequate for storing and distributing water so Karnataka’s proposal is ex-facie (on the face of it) untenable and should be rejected outright.
=> It has also held that the reservoir is not just for drinking water alone, but to increase the extent of irrigation, which is in clear violation of the Cauvery Water Disputes Award.
Award by the tribunal and the Supreme Court:
The tribunal was set up in 1990 and made its final award in 2007, granting 419 tmcft of water to Tamil Nadu, 270 tmcft to Karnataka, 30 tmcft to Kerala and 7 tmcft to Puducherry. The tribunal ordered that in rain-scarcity years, the allocation for all would stand reduced.
However, both Tamil Nadu and Karnataka expressed unhappiness over the allocation and there were protests and violence in both states over water-sharing. That saw the Supreme Court take up the matter and, in a 2018 judgment, it apportioned 14.75 tmcft from Tamil Nadu’s earlier share to Karnataka.
What’s the way out then?
The Centre has said the project required the approval of the Cauvery Water Management Authority’s (CWMA). The Detail Project Report (DPR) sent by Karnataka was tabled in the CWMA several times for approval, but the discussion on this issue could not take place due to a lack of consensus among party states Karnataka and Tamil Nadu. Also, as per the Cauvery Water Dispute Tribunal‘s final award, which was modified by the Supreme Court, acceptance of CWMA would be a prerequisite for consideration of the DPR by the Jal Shakti Ministry. Since the project was proposed across an inter-state river, it required approval of lower riparian state(s) as per the interstate water dispute act.