What is the area of the hall ?
I. The labour cost of flooring the hall is Rs.3500
II. The material cost of flooring the hall per sqmetre is Rs.250
III. The total cost of flooring the hall is Rs.16500
Explanation:
From I, II, III
Let area be ‘x’
Total material cost = Rs.250x
Labour Cost = 250x + 3500 = 16500
X = 13000/250 = 52 sq m
Hence, option 4 is the correct answer.