Daily Current Affairs on Shinku La Pass For All-Weather Connectivity for CDS Exam Preparation

Others

Current GK (CDS)

Title

45:30

Video Progress

8 of 24 completed

Notes Progress

5 of 15 completed

MCQs Progress

38 of 100 completed

Subjective Progress

8 of 20 completed

Continue to Next Topic

Indian Economy - Understanding the basics of Indian economic system

Next Topic

Shinku La Pass For All-Weather Connectivity

The Union Cabinet on Wednesday (15 Feb) approved the construction of Shinku La Tunnel to provide all-weather connectivity between Himachal Pradesh and Ladakh.

  • The Shinku La or Shingo La is a mountain pass located on the border between HP and Ladakh. 
  • The 4.1-km-long tunnel will be completed by December 2025 at a cost of Rs 1,681 crore. 
  • It is at an altitude of 5,091 metres. In 2016, the Border Road Organization built a road to the pass. However, the road couldn’t be accessed during winter and large-wheeled vehicles couldn’t pass through.

ProfileResources

Download Abhipedia Android App

Access to prime resources

Downlod from playstore
download android app download android app for free