Daily Current Affairs on Hathnikund Dam for State General Knowledge (GK) Preparation

Geography and Environment

Haryana

Title

45:30

Video Progress

8 of 24 completed

Notes Progress

5 of 15 completed

MCQs Progress

38 of 100 completed

Subjective Progress

8 of 20 completed

Continue to Next Topic

Indian Economy - Understanding the basics of Indian economic system

Next Topic

Hathnikund Dam

Why in news:

  • Haryana Chief Minister Manohar Lal Khattar has approved the preliminary report of Hathnikund Dam, an ambitious project of the state government to make use of the flood situation in Yamuna River during the monsoon season for groundwater recharging.



 

Key Points:

  • After a review meeting on the dam, Khattar cleared the preliminary report prepared by the Haryana Irrigation and Water Resources Department. The report will further be sent to the Central Water Commission (CWC). Apart from the Water Commission, this report will also be sent to five neighbouring states – Himachal Pradesh, Uttarakhand, Uttar Pradesh, Rajasthan and Delhi.
  • Stressing the importance of Hathnikund Dam project for the Haryana government, the CM said the report is crucial to the construction of this dam.
  • Every year, during the rainy season, water is wasted and the Yamuna area gets flooded. In view of this, the Haryana government has decided to build a dam in Hathnikund.  The catchment area of this dam will be about 11,170 square kilometer.
  • The dam is to be built in the region of Himachal Pradesh, Haryana, Uttarakhand and Uttar Pradesh.  With its construction, Haryana will not only get electricity but also water supply. The annual power generation capacity of Hathnikund Dam will be 763 Million Units (MU).
  • It is important to note here that as per the requirement of the Central Water Commission, it is necessary to first prepare a preliminary report for obtaining the ‘in-principle’ consent of the CWC for preparation of the detailed project report. This report is now to be sent to the Central Water Commission, Himachal Pradesh, Uttarakhand, Uttar Pradesh, Rajasthan and Delhi.
  • With the construction of Hathnikund Dam, groundwater recharging will take place in the surrounding area and farmers will benefit from it.  This apart, flood situations arise in the area of Yamuna river every year during the monsoon. This damages the crops of the farmers.  With the construction of the dam, the problem of floods will be solved. Renuka, Kisau and Lakhwar dams will benefit from the construction of this dam. Hathnikund dam will become the balancing reservoir function of these three dams.
  • The dam will not only supply electricity and water but will also be made a centre of tourism.  Any dam is also important from the point of view of tourism.  The area where this dam is going to be built is very green and close to nature. It will also be developed from the point of view of tourists.

ProfileResources

Download Abhipedia Android App

Access to prime resources

Downlod from playstore
download android app download android app for free