send mail to support@abhimanu.com mentioning your email id and mobileno registered with us! if details not recieved
Resend Opt after 60 Sec.
By Loging in you agree to Terms of Services and Privacy Policy
Claim your free MCQ
Please specify
Sorry for the inconvenience but we’re performing some maintenance at the moment. Website can be slow during this phase..
Please verify your mobile number
Login not allowed, Please logout from existing browser
Please update your name
Subscribe to Notifications
Stay updated with the latest Current affairs and other important updates regarding video Lectures, Test Schedules, live sessions etc..
Your Free user account at abhipedia has been created.
Remember, success is a journey, not a destination. Stay motivated and keep moving forward!
Refer & Earn
Enquire Now
My Abhipedia Earning
Kindly Login to view your earning
Support
Why in the News?
Key Points:
About the Project:
⇒ The Ghatampur Thermal Power Project has a total installed capacity of 1,980 MW, comprising three supercritical units of 660 MW each.
⇒ The remaining two units are scheduled to be commissioned by the financial year 2025–26.
⇒ It is being implemented by Neyveli Uttar Pradesh Power Limited (NUPPL), a joint venture between NLC India Limited and Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL).
⇒ The total project cost is estimated at ?21,780.94 crore.
Power Allocation:
⇒ A Power Purchase Agreement (PPA) has been signed to allocate 1,487.28 MW (75.12%) of the generated power to Uttar Pradesh and the remaining 492.72 MW (24.88%) is earmarked for Assam.
Environmental Safeguards:
⇒ The plant is equipped with Selective Catalytic Reduction (SCR) technology to reduce nitrogen oxide (NOx) emissions.
⇒ Flue Gas Desulphurization (FGD) systems have been installed to control sulphur dioxide (SOx) emissions.
⇒ The project will have a Zero Liquid Discharge (ZLD) system to ensure no water is discharged from the plant.
By: ASRAF UDDIN AHMED ProfileResourcesReport error