send mail to support@abhimanu.com mentioning your email id and mobileno registered with us! if details not recieved
Resend Opt after 60 Sec.
By Loging in you agree to Terms of Services and Privacy Policy
Claim your free MCQ
Please specify
Sorry for the inconvenience but we’re performing some maintenance at the moment. Website can be slow during this phase..
Please verify your mobile number
Login not allowed, Please logout from existing browser
Please update your name
Subscribe to Notifications
Stay updated with the latest Current affairs and other important updates regarding video Lectures, Test Schedules, live sessions etc..
Your Free user account at abhipedia has been created.
Remember, success is a journey, not a destination. Stay motivated and keep moving forward!
Refer & Earn
Enquire Now
My Abhipedia Earning
Kindly Login to view your earning
Support
Mumbai will start the first undersea tunnel of India in 2023 which is being constructed as part of Coastal Road project of Mumbai.
Key Facts
=> Two tunnels will be built under the Mumbai Coastal Road Project.
=> The tunnel will have the length of 2.07 km out of which 1 kilometre portion will be under the sea.
=> It is the first undersea road tunnel in India.
=> It will pass through Arabian Sea near Girgaon Chowpatty.
=> The tunnel will start from the Priyadarshani Park and will terminate at the Netaji Subhash Road in Marine Drive.
=> It will be built at a depth of 20m below the seabed.
=> The total cost of project is Rs 2,798.44 crore.
=> Each of the tunnel will be completed in 8 to 9 months.
=> It is being built by the India’s biggest Tunnel Boring Machine.
Mumbai Coastal Road Project
=> It is a 10.58-km long road project that starts from the Marine Drive and terminates at the Worli-end of Bandra-Worli Sea Link.
=> It comprises of land-filled roads, bridges and tunnels.
=> This project was started under the plan of linking South Mumbai with North Mumbai with a toll-free road.
=> It will also ease the traffic run in the city.
Challenges
The construction of the tunnel is challenging because it will be built under sea. The major challenges include:
1. Flow of sea water into the tunnel.
2.Tunnel will exert pressure of the sea so there will be fear of tunnel caving.
However, the tunnel is being constructed near the coast so it has eased the construction process. Further, all the safety measures are being taken to ensure stability of tunnel.
By: ASRAF UDDIN AHMED ProfileResourcesReport error