Multiple Choice Questions on A train speeds past a pole in 15 seconds and a platform 100 m long in 25 seconds Its length is ........ for SBI (Clerical) Exam Preparation

Problems on trains

Quantitative Aptitude (SBI-CL) SBI (Clerical) Exam

Title

45:30

Video Progress

8 of 24 completed

Notes Progress

5 of 15 completed

MCQs Progress

38 of 100 completed

Subjective Progress

8 of 20 completed

Continue to Next Topic

Indian Economy - Understanding the basics of Indian economic system

Next Topic

Study Notes

    A train speeds past a pole in 15 seconds and a platform 100 m long in 25 seconds. Its length is:

    50m

    Incorrect Answer

    100m

    Incorrect Answer

    150m

    Correct Answer

    180m

    Incorrect Answer
    Explanation:

    Let the length of the train be x metres and its speed be y m/sec.
    Then, (x/y)= 15   y =(x/15)

    (x+100)/25 = x/15

    => 15(x + 100) = 25x

    => 15x + 1500 = 25x

    => 1500 = 10x

    => x = 150 m.

    Hence, option 3 is the correct answer.


    ProfileResources

    Download Abhipedia Android App

    Access to prime resources

    Downlod from playstore
    download android app download android app for free