send mail to support@abhimanu.com mentioning your email id and mobileno registered with us! if details not recieved
Resend Opt after 60 Sec.
By Loging in you agree to Terms of Services and Privacy Policy
Claim your free MCQ
Please specify
Sorry for the inconvenience but we’re performing some maintenance at the moment. Website can be slow during this phase..
Please verify your mobile number
Login not allowed, Please logout from existing browser
Please update your name
Subscribe to Notifications
Stay updated with the latest Current affairs and other important updates regarding video Lectures, Test Schedules, live sessions etc..
Your Free user account at abhipedia has been created.
Remember, success is a journey, not a destination. Stay motivated and keep moving forward!
Refer & Earn
Enquire Now
My Abhipedia Earning
Kindly Login to view your earning
Support
Type your modal answer and submitt for approval
The Union government has approved various measures to promote hydropower sector. India is blessed with huge water resources and there are vast possibilities of producing hydro-electricity but only 23% of the total installed capacity. While hydropower projects are critical for economic growth and development, it is equally important to fully assess its potential social and environmental impact in the long-term. The challenge lies in finding the right balance between the need for rapid development and the necessity of protecting the environment. According to an assessment by the Central Electricity Authority, the economically exploitable hydropower potential in India is around 148 GW. As of 2016-17, the installed utilizable hydropower capacity in India is around 45 GW or about 14 % of its total installed power capacity. As of now, around 31 % of its total utilizable hydropower capacity has been installed.
Which was the first hydro-power project in Asia?
Bakeshwar Project
Giral Project
Parichha Project
Shiva-Samundram Dam
Koyna Hydroelectric Project
Shivanasamudra is a small town in the Chamarajanagar District of the state of Karnataka, India. It is situated on the banks of the river Kaveri, which forms here the boundary to the mandya District, and is the location of one of the first hydro-electric power stations in Asia, which was set up in 1902.The project was designed by Diwan Sheshadri Iyer. The first hydro electric power station became operational on June 30, 1902 and the then resident General of Mysore state, Donald Robertson launched the 700 KW hydro electric station.