send mail to support@abhimanu.com mentioning your email id and mobileno registered with us! if details not recieved
Resend Opt after 60 Sec.
By Loging in you agree to Terms of Services and Privacy Policy
Claim your free MCQ
Please specify
Sorry for the inconvenience but we’re performing some maintenance at the moment. Website can be slow during this phase..
Please verify your mobile number
Login not allowed, Please logout from existing browser
Please update your name
Subscribe to Notifications
Stay updated with the latest Current affairs and other important updates regarding video Lectures, Test Schedules, live sessions etc..
Your Free user account at abhipedia has been created.
Remember, success is a journey, not a destination. Stay motivated and keep moving forward!
Refer & Earn
Enquire Now
My Abhipedia Earning
Kindly Login to view your earning
Support
Context: On 15 February, 2015, Prime Minister Narendra Modi made an interesting observation in his inaugural speech for the first RE-Invest global summit in New Delhi. He remarked that Indian energy sector has been thinking in terms of Mega Watts (MW), but for the first time, India had started talking about Giga Watts (GW). It was inconceivable that India aimed at 100 GW of installed solar power capacity by 2022, given that the entire country had under 3 GW of existing installations when the Modi government took over. Yet, the ambitious target set clearly signalled the government’s intent to make solar energy an integral part of Indian energy security strategy. India has managed to hit about 35 GW in installed capacity till now. One major gap is rooftop solar, which has not progressed much. So while adding 65 GW of solar capacity in two years looks tough, opening up the rooftop solar market nationwide can help push the envelope. But even this current progress from 3 GW to 35 GW was not easy. One of the projects which gave impetus to this journey was the Rewa Ultra Mega Solar Ltd (RUMSL) solar plant, inaugurated by PM Modi on 10 July.
About Asia's largest solar power project in Rewa
What is Grid parity?
Solar Sector in India As on April 30, 2020, the installed renewable energy capacity in India stood at 87.26 GW, of which, solar comprised 34.81 GW. India has set a target of achieving 175GW of renewable energy capacity by 2022. This includes:
India’s Nationally Determined Contribution
Issues and Challenges in the Solar Sector Dependence on Imports
Government Initiatives to Promote Solar Power National Solar Mission: Launched in 2010, it aims to achieve 100GW capacity by 2022. It is aimed at reducing the cost of solar power generation in the country through
Grid Connected Rooftop and Small Solar Power Plants Programme: It aims at installation of grid connected roof top solar systems from 1 kWp to 500 kWp capacity in residential, commercial, institutional and industrial buildings.
About International Solar Alliance (ISA)
Road Ahead
Report error
Access to prime resources
New Courses