Daily Current Affairs on Mechi River Bridge for UPSC Civil Services Examination (General Studies) Preparation

India and the world

Title

45:30

Video Progress

8 of 24 completed

Notes Progress

5 of 15 completed

MCQs Progress

38 of 100 completed

Subjective Progress

8 of 20 completed

Continue to Next Topic

Indian Economy - Understanding the basics of Indian economic system

Next Topic

Mechi River Bridge
  •  The Union Cabinet chaired by Prime Minister Shri Narendra Modi today approved a Memorandum of Understanding (MoU) to be signed between India and Nepal for laying down implementation arrangement on Cost sharing, Schedules and Safeguard issues for starting construction of a new Bridge over Mechi River at Indo-Nepal border.
  • The estimated cost of construction of the bridge is Rs. 158.65 crore, which would be funded by Government of India through ADB loan.
  • The new bridge is part of up-gradation of the Kakarvitta (Nepal) to Panitanki Bypass (India) on NH 327B covering a length of 1500 meters including a 6 lane approach road of 825 meters.
  • Mechi Bridge is the ending point of Asian Highway 02 in India leading to Nepal and provides critical connectivity to Nepal.
  • The construction of the bridge will improve regional connectivity and has potential to strengthen cross border trade between both the countries and cementing ties by strengthening industrial, social and cultural exchanges.
  • National Highway and Infrastructure Development Corporation (NHIDCL) under Ministry of Road Transport & Highways has been designated as the implementing agency for this project.
  • The construction of the bridge will improve regional connectivity and has potential to strengthen cross border trade between both the countries and cementing ties by strengthening industrial, social and cultural exchanges.

About Mechi river:

  • The Mechi River is a trans-boundary river flowing through Nepal and India. It is a tributary of the Mahananda River.
  • The Mechi originates in the Mahabharat Range in Nepal. It flows through Nepal, forms the boundary between India and Nepal and then flows through the Indian state of Bihar to join the Mahananda in Kishanganj district.
  • The Mechi-Mahananda interfluve is a transitional area between the hills and the plains and exhibits a wide range of topographical variations. The rivers originating in the hills attain a braiding character and have well developed alluvial fans.
  • The Mahananda river system of which Mechi is a part has a catchment area of 8,088 square kilometres (3,123 sq mi) in Nepal and 11,520 square kilometres (4,450 sq mi) in India.
  • There is a proposal to link the Mechi to the Kosi. Kosi–Mechi interlinking is part of a NPR 56000 billion River Interlinking Project proposed to Nepal by India. The Kankai forms part of this project. Besides the High Dam, a barrage across Kosi river will also be constructed near village Chatra, 10 to 12 kilometres (6 to 7 mi) below the proposed Kosi High Dam, to transfer water to the Mechi through the Kosi–Mechi link canal

ProfileResources

Download Abhipedia Android App

Access to prime resources

Downlod from playstore
download android app download android app for free